1 Risk and Uncertainty
Risk and uncertainty need to be factored into the strategic and operational decision-making processes.
In the case of risk, an expected value of the outcome can be determined by summing the products of each alternative and its probability.
EV can be representative if a project is repeated many times because the EV will equate to the long-term average result. However, most strategic plans, and any projects making them up, are a "one-off".
This introduces two problems: 1. Usually the expected value is not one of the possible outcomes. 2. The expected value gives no indication about the spread of results that might occur.
Here, both scenarios have the same expected values, but Scenario 1 has substantially less variation in outcome. With Scenario 2, however, outcome 2 could be very serious for the organisation.
2 Decision Trees
Decision trees can help choose between several courses of action. They provide a highly effective structure to lay out options and investigate the possible outcomes of choosing those options.
They also help to form a balanced picture of the risks and rewards associated with each possible course of action.
歷年樣卷
考試大綱
詞匯表
報(bào)考指南
考官文章
思維導(dǎo)圖
安卓版本:8.7.30 蘋果版本:8.7.30
開發(fā)者:北京正保會(huì)計(jì)科技有限公司
應(yīng)用涉及權(quán)限:查看權(quán)限>
APP隱私政策:查看政策>
HD版本上線:點(diǎn)擊下載>
官方公眾號(hào)
微信掃一掃
官方視頻號(hào)
微信掃一掃
官方抖音號(hào)
抖音掃一掃
Copyright © 2000 - odtgfuq.cn All Rights Reserved. 北京正保會(huì)計(jì)科技有限公司 版權(quán)所有
京B2-20200959 京ICP備20012371號(hào)-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號(hào)