問題:
On 1 October 2009 Mocca entered into a construction contract that was expected to take 27 months and therefore be completed on 31 December 2011. Details of the contract are:
Plant for use on the contract was purchased on 1 January 2010 (three months into the contract as it was not required at the start) at a cost of $8 million. The plant has a four-year life and after two years, when the contract is complete, it will be transferred to another contract at its carrying amount. Annual depreciation is calculated using the straight-line method (assuming a nil residual value) and charged to the contract on a monthly basis at 1/12 of the annual charge.
The correctly reported income statement results for the contract for the year ended 31 March 2010 were:
The percentage of completion is calculated as the agreed value of work completed as a percentage of the agreed contract price.
Required:
Calculate the amounts which would appear in the income statement and statement of financial position of Mocca, including the disclosure note of amounts due to/from customers, for the year ended/as at 31 March 2011 in respect of the above contract.
(10 marks)
Answer:
Mocca
Income statement year ended 31 March 2011
正保會(huì)計(jì)網(wǎng)校2014年6月招生方案>>
歷年樣卷
考試大綱
詞匯表
報(bào)考指南
考官文章
思維導(dǎo)圖
安卓版本:8.7.30 蘋果版本:8.7.30
開發(fā)者:北京正保會(huì)計(jì)科技有限公司
應(yīng)用涉及權(quán)限:查看權(quán)限>
APP隱私政策:查看政策>
HD版本上線:點(diǎn)擊下載>
官方公眾號(hào)
微信掃一掃
官方視頻號(hào)
微信掃一掃
官方抖音號(hào)
抖音掃一掃
Copyright © 2000 - odtgfuq.cn All Rights Reserved. 北京正保會(huì)計(jì)科技有限公司 版權(quán)所有
京B2-20200959 京ICP備20012371號(hào)-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號(hào)