  環(huán)境成本會計 - ACCOUNTING FOR ENVIRONMENTAL COSTS

  In the context of Paper F5, when the syllabus requires you to describe the different methods of accounting for environmental costs, it aims to cover two areas:

    Internal reporting of environmental costs, which has already been discussed in the introduction.

    Management accounting techniques for the identification and allocation of environmental costs: the most appropriate ones for the Paper F5 syllabus are those identified by the UNDSD, namely input/outflow analysis, flow cost accounting, activity-based costing and lifecycle costing.

  輸入/輸出分析 - INPUT/OUTFLOW ANALYSIS

  This technique records material inflows and balances this with outflows on the basis that, what comes in, must go out. So, if 100kg of materials have been bought and only 80kg of materials have been produced, for example, then the 20kg difference must be accounted for in some way. It may be, for example, that 10% of it has been sold as scrap and 90% of it is waste. By accounting for outputs in this way, both in terms of physical quantities and, at the end of the process, in monetary terms too, businesses are forced to focus on environmental costs.

  流量成本處理 - FLOW COST ACCOUNTING

  This technique uses not only material flows but also the organisational structure. It makes material flows transparent by looking at the physical quantities involved, their costs and their value. It divides the material flows into three categories: material, system and delivery and disposal. The values and costs of each of these three flows are then calculated. The aim of flow cost accounting is to reduce the quantity of materials which, as well as having a positive effect on the environment, should have a positive effect on a business‘ total costs in the long run.

  作業(yè)成本處理 - ACTIVITY-BASED COSTING

  ABC allocates internal costs to cost centres and cost drivers on the basis of the activities that give rise to the costs. In an environmental accounting context, it distinguishes between environment-related costs, which can be attributed to joint cost centres, and environment-driven costs, which tend to be hidden on general overheads.

  周期成本處理 - LIFECYCLE COSTING

  Within the context of environmental accounting, lifecycle costing is a technique which requires the full environmental consequences, and, therefore, costs, arising from production of a product to be taken account across its whole lifecycle, literally ‘from cradle to grave’

  相關(guān)鏈接:

  2016ACCA F5知識點(diǎn):管理環(huán)境成本 1
  2016ACCA F5知識點(diǎn):管理環(huán)境成本 2

我要糾錯】 責(zé)任編輯:小吉油

免費(fèi)試聽

限時免費(fèi)資料

  • 近10年A考匯總

    歷年樣卷

  • 最新官方考試大綱

    考試大綱

  • 各科目專業(yè)詞匯表

    詞匯表

  • ACCA考試報考指南

    報考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串講直播

    思維導(dǎo)圖

回到頂部
折疊
網(wǎng)站地圖

Copyright © 2000 - odtgfuq.cn All Rights Reserved. 北京正保會計科技有限公司 版權(quán)所有

京B2-20200959 京ICP備20012371號-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號