<\%@ include file=/new/184/188/2005/12/ad98033048599221500214560_9652.htm%\>
<\%@ include file=/new/184/188/2005/12/ad98033048599221500214560_9652.htm%\>
<\%@ include file=/new/184/188/2005/12/ad98033048599221500214560_9652.htm%\>
首頁<\%@ include file=/new/184/188/2005/12/ad98033048599221500214560_9652.htm%\> 正文

落實(shí)西部大開發(fā),和田輸氣管道工程破土動工

2002-8-9 8:43新華網(wǎng)·張建平 【 】【打印】【我要糾錯
落實(shí)西部大開發(fā),和田輸氣管道工程破土動工
相關(guān)熱詞:西部大開發(fā)輸氣管道